1 |
Atterberg Liquid Limit (LL) |
1 |
64,000 |
Uji |
2 |
Atterberg Plastic Limit (PL) |
1 |
64,000 |
Uji |
3 |
Pengujian Direct Shear |
3 |
150,000 |
Uji |
4 |
Pengujian Hydrometer |
3 |
100,000 |
Uji |
5 |
Pengujian Undisturbed |
1 |
150,000 |
Pengambilan |
6 |
Atterberg Limit |
3 |
100,000 |
Sampel |
7 |
CBR Lapangan |
3 |
150,000 |
Titik |
8 |
Core Drilling Tanah Tiap Kedalaman Pengambilan Sampel Kedalaman 0-30 m |
1 |
120,000 |
Titik |
9 |
Core Drilling Tanah Tiap Kedalaman Pengambilan Sampel Kedalaman 41-60 m |
1 |
300,000 |
Titik |
10 |
Core Drilling Tanah Tiap Kedalaman Pengambilan Sampel Kedalaman 31-40 m |
1 |
170,000 |
Titik |
11 |
SPT |
30 |
150,000 |
Uji |
12 |
Bor Dangkal 5 Meter |
2 |
400,000 |
Titik |
13 |
Sand Cone |
3 |
150,000 |
Titik |
14 |
Volumetri Gravimetri |
4 |
100,000 |
Sampel |
15 |
DCPT |
3 |
150,000 |
Titik |
16 |
Permeability Lapangan |
1 |
1,000,000 |
Titik |
17 |
Gradasi Butiran |
5 |
100,000 |
Sampel |
18 |
Traxial UU |
7 |
150,000 |
Sampel |
19 |
CBR Laboratorium |
5 |
250,000 |
Sampel |
20 |
Modified Proctor |
7 |
250,000 |
Sampel |
21 |
Standart Proctor |
7 |
200,000 |
Sampel |
22 |
Sondir Ringan 2,5 Ton |
2 |
750,000 |
Titik |
23 |
Tes Pit |
1 |
500,000 |
Titik |
24 |
Consolidation test |
8 |
150,000 |
Sampel |
25 |
Atterberg Plastic Index (PI) |
1 |
64,000 |
Uji |