A |
Uji Tekan |
|
|
|
1 |
Kuat Tekan Kubus (KAN) |
2 |
40,000 |
1 Sampel (Minimal 3 Sampel) |
2 |
Kuat Tekan Uskup |
2 |
70,000 |
1 Sampel (Minimal 3 Sampel) |
3 |
Uji Tekan Mortar |
2 |
20,000 |
1 Sampel (Minimal 3 Sampel) |
4 |
Analisa Kuat Tekan Mortar |
2 |
800,000 |
Analisa |
5 |
Kuat Tekan Kanstin |
2 |
150,000 |
1 Sampel (Minimal 3 Sampel) |
6 |
Kuat Tekan Paving (KAN) |
2 |
15,000 |
1 Sampel (Minimal 10 Sampel) |
7 |
Kuat Tekan Cylinder (KAN) |
2 |
45,000 |
1 Sampel (Minimal 3 Sampel) |
B |
Uji Tarik / Bending Baja |
|
|
|
1 |
Pemanfaatan Alat Geolistrik untuk Pengujian Geolistrik di lapangan |
1 |
1,000,000 |
Titik |
2 |
Kuat Tarik Baja Diameter 32 mm (KAN) |
3 |
370,000 |
1 Sampel (Minimal 3 Sampel) |
3 |
Kuat Tarik Baja Diameter 20 - 22 mm (KAN) |
3 |
150,000 |
1 Sampel (Minimal 3 Sampel) |
4 |
Kuat Tarik Baja Diameter 6 - 10 mm (KAN) |
3 |
110,000 |
1 Sampel (Minimal 3 Sampel) |
5 |
Kuat Tarik Baja Diameter 25 mm (KAN) |
3 |
175,000 |
1 Sampel (Minimal 3 Sampel) |
6 |
Kuat Tarik Baja Diameter 12 - 19 mm (KAN) |
3 |
125,000 |
1 Sampel (Minimal 3 Sampel) |
C |
Uji Bahan |
|
|
|
1 |
Kuat Lentur |
1 |
50,000 |
Sampel |
2 |
Hardness Test |
3 |
100,000 |
1 Titik (Minimal 10 Titik) |
3 |
Rebar detector (dengan pencitraan 3D) |
3 |
400,000 |
1 Bidang Luasan (Minimal 5 BL) |
4 |
Ultrasonic Pulse Velocity |
3 |
2,000,000 |
1 Uji (Maksimal 10 Bidang) |
5 |
Kotoran Organik (KAN) |
1 |
110,000 |
Uji |
6 |
Hammer test |
3 |
100,000 |
1 Titik (Minimal 10 Titik) |
7 |
Abrasi LA (KAN) |
3 |
145,000 |
Uji |
8 |
Profometer test |
3 |
200,000 |
1 Bidang Luasan (Minimal 10 BL) |
9 |
Core Drill Beton Pengambilan Sampel |
3 |
250,000 |
Sampel |
10 |
Core Drill Beton Pengujian Sampel |
3 |
150,000 |
Sampel |
11 |
Mix Design Beton (pengujian agregat dalam ruang lingkup KAN) |
28 |
1,500,000 |
Job Mix |
12 |
Kuat Tarik Belah |
3 |
50,000 |
Sampel |
13 |
Abrasi Paving/Keausan |
2 |
20,000 |
Sampel |
14 |
Resapan Paving |
2 |
20,000 |
Sampel |